NRM Classification
Sub-Element: 2.1.1 - 1 Steel frames Confidence: High
Element: 2.1 - Element 2.1
Group: 2 - Superstructure
General Information
| Issue Date | 2022-08-31 |
|---|
Product Information
Application
Full displacement pile system for erection of buildings or engineering structures (bridges, wind power and photovoltaic plants, sound protection walls, pipelines, masts) and to secure excavation pits and stabilise slopes. Pile tubes are driven into the ground to transmit forces from the building into the ground. Can be filled with concrete or applied with or without grouting. This EPD focuses on insertion of pile tubes without concrete filling or grouting.
LCA Information
| LCA Software | SimaPro 9.3.0.3 |
|---|
Manufacturing & Lifecycle
Packaging
Bundled with squared lumber and PET binding tapes for storage and transport. Both packaging materials can be thermally recycled.
Transport
Transported mainly by truck within Europe and by ship overseas.