Components

9 Total
Search & Filter Components
Clear
0.2.1-1 m2

Demolition of entire buildings

Details to state: details to be stated
0.2.1-2 m2

Demolition of major parts of existing buildings

Details to state: details to be stated
0.2.1-3 nr

Temporary propping to existing basement retaining walls

Details to state: details,including type of material, whether single or double …
0.2.1-4 m

Extra over temporary propping for providing wailings

Details to state: details, including type of material, to be stated
0.2.1-5 nr

Periodic technical inspections of temporary propping

Details to state: details to be stated
0.2.1-6 nr

Returning to site to reposition temporary props

Details to state: details, including type of material, whether single or …
0.2.1-7 nr

Removal of temporary props

Details to state: details to be stated
0.2.1-8 m

Removal of wailings

Details to state: details to be stated
0.2.1-9 nr

Grubbing up of anchor blocks/foundations for temporary props and infilling voids

Details to state: details, including type of filling material and size …
9

Total Components

656

Different Units

1

Pages

API Access

Access components data programmatically: