Components

660 Total
Search & Filter Components
Clear
1.1.3-8 nr

Gullies, floor outlets, etc.

Details to state: details to be stated
1.1.3-9 nr

Internal manholes,catch-pits, petrol interceptors, etc.

Details to state: details to be stated
1.1.3-10 %

Testing of drainage installations.

1.1.3-11 %

Commissioning of drainage installations

1.1.4-1 m3

Basement excavation

Details to state: details,including average depth of excavation, to be stated
1.1.4-2 m3

Disposal of excavated material

Details to state: details to be stated
1.1.4-3 m3

Extra for disposal of contaminated excavated materia

Details to state: details to be stated
1.1.4-4 m2

Earthwork support

Details to state: details to be stated
1.1.4-5 m3

Additional excavation

Details to state: details to be stated
1.1.5-1 m/m2

Basement retaining wall

Details to state: details to be stated
1.1.5-2 m2

Piling mats/platforms

Details to state: details,including thickness of mat/platform (mm), to be stated
1.1.5-3 item

Piling plant

Details to state: details to be stated
1.1.5-4 nr

Moving piling rig to pile position

1.1.5-5 m

Guide walls

Details to state: details to be stated
1.1.5-6 nr

Piles

Details to state: details,including type,diameter (mm), depth (m), total length (m) …
1.1.5-7 m

Contiguous bored pile walls

Details to state: details,including diameter (mm), depth (m), total length (m) …
1.1.5-8 m3

Disposal of excavated material arising from piling

1.1.5-9 nr/m

Cutting off tops of concrete piles

1.1.5-10 m2

Steel sheet piling

Details to state: details, including total area (m2) and total driven …
1.1.5-11 nr

Cutting off surplus lengths of steel sheet piling