8.6.3-1

Drainage runs below ground

Unit: m Sub-Element: 8.6.3 - 3 External chemical, toxic and industrial liquid waste drainage
Component Information
Code:
8.6.3-1
Sequence:
1
Unit:
m
Sub-Element:
8.6.3 - 3 External chemical, toxic and industrial liquid waste drainage
Description:

Drainage runs below ground

Details to State:

details, including depth of trench (m) and nominal size of pipe (mm), to be stated.

Component Statistics
7
Measurement Rules
18
Included Items
2
Excluded Items
Measurement Rules (7)
C1 1

Where components are to be enumerated, the number of components is to be stated.

C2 2

The length of linear components measured is their extreme length, over all branches, fittings, etc.

C3 3

Other cost-significant components are to be described and identified separately. Such components are to be measured by area (m2) or linear measurement (m), or enumerated (nr) separately in accordance with the rules of measurement for this sub-element.

C4 4

Descriptions should include the amount of any PC sum included in the unit rates applied to the item

C5 5

Work outside the curtilage of the site is to be described and identified separately.

C6 6

Where the contractor is only responsible for designing specific elements and/or components of the building project (i.e. not the entire building project), contractor-designed work is to be described and identified separately.

C7 7

The percentage additions for testing and commissioning are to be applied to the total cost of the items comprising the sub-element. A single combined percentage addition can be applied to cover the costs of both testing and commissioning.

Included Items (18)
1.

Trenches for pipework, including excavation, earthwork support, backfilling and disposal of surplus material.

2.

Pipework and pipework fittings.

3.

Granular beds and surrounds,concrete beds, cradles, haunchings and surrounds,and foamed concrete backfill.

4.

Supports for aboveground drainage, including earth embankments.

5.

Connections, tanks, etc

6.

Storage tanks and vessels.

7.

Settlement tanks.

8.

Effluent treatment plant.

9.

Dosing equipment.

10.

Sterilisation equipment.

11.

Connections to equipment.

12.

Control components located externally

13.

Monitoring equipment located externally.

14.

Painting, anti-corrosion treatments and coating systems for drainage pipelines.

15.

Builder’s work in connection with external laboratory and industrial liquid waste drainage.

16.

Sundry items.

17.

Testing and commissioning.

18.

Where works are to be carried out by a subcontractor, the subcontractor’s preliminaries, design fees, risk allowance, overheads and profit, with allowance for these to be made within unit rate applied to element or component.

Excluded Items (2)
1. Ref: 5.3.2

Laboratory and industrial liquid waste drainage from the external face of the external wall of the building to the appliance or equipment (included in sub-element 5.3.2).

2. Ref: 8.6.3

Testing and commissioning of external laboratory and industrial liquid waste drainage (included in sub-element 8.6.3).