7.6.4-1

Timber repairs

Unit: nr/m/m2 Sub-Element: 7.6.4 - 4 Timber repairs
Component Information
Code:
7.6.4-1
Sequence:
1
Unit:
nr/m/m2
Sub-Element:
7.6.4 - 4 Timber repairs
Description:

Timber repairs

Details to State:

details to be stated

Component Statistics
4
Measurement Rules
8
Included Items
1
Excluded Items
Measurement Rules (4)
C1 1

Where components are to be enumerated, the number of components is to be stated.

C2 2

The length of linear components measured is their extreme length,over all obstructions.

C3 3

The area measured is the surface area of the repair.

C4 4

Work arising out of party wall awards/agreements is to be described and identified separately.

Included Items (8)
1.

Taking down existing work, cleaning and resurfacing, cutting out defective or decayed timber, piecing-in new timber, rejointing and refixing

2.

Resin repairs to timbers.

3.

Preservative/fire-retardant treatments.

4.

Repairs to structural members (e.g. roof members and structural beams).

5.

Repairs to existing windows,doors, hatches, rooflights, frames, linings, etc. (including overhauling/renewing ironmongery, sash cords, opening gear, etc.).

6.

Repairs to staircases, including handrails and balustrades.

7.

Sundry items.

8.

Where works are to be carried out by a subcontractor, the subcontractor’s preliminaries, design fees, risk allowance, overheads and profit, with allowance for these to be made within unit rate applied to element or component.

Excluded Items (1)
1. Ref: 2 , 7.1.1

Renewing/replacing timber components in their entirety,doors, frames, rooflights, etc. (included in group element 2 or sub-element 7.1.1,as appropriate).