7.3.2-1
Eradication treatment
Component Information
- Code:
- 7.3.2-1
- Sequence:
- 1
- Unit:
- m2
- Sub-Element:
- 7.3.2 - 2 Fungus/beetle eradication
Eradication treatment
details to be stated.
Component Statistics
Measurement Rules
Included Items
Excluded Items
Measurement Rules (3)
The area measured is the surface area of the treatment,with no deduction for voids.
Work arising out of party wall awards/agreements is to be described and identified separately.
Where the contractor is only responsible for designing specific elements and/or components of the building project (i.e. not the entire building project), contractor-designed work is to be described and identified separately.
Included Items (9)
Opening up existing work (e.g. lifting and replacing floorboards).
Cutting out fungus- or beetle-infested timber, plaster, etc., and disposing of cut out material.
Applying preservative treatment (e.g. irrigation of walls by pressure injection, application of fungicide solution and treatment with insecticide).
Solid rod preservative inserts.
Preservative treatments.
Paste preservative treatment.
Insecticidal smoke treatment.
Sundry items.
Where works are to be carried out by a subcontractor, the subcontractor’s preliminaries, design fees, risk allowance,overheads and profit, with allowance for these to be made within unit rate applied to element or component.