7.2.1-1
Equipment/plant repairs
Component Information
- Code:
- 7.2.1-1
- Sequence:
- 1
- Unit:
- nr
- Sub-Element:
- 7.2.1 - Repairs to existing services
Equipment/plant repairs
details to be stated
Component Statistics
Measurement Rules
Included Items
Excluded Items
Measurement Rules (8)
Where components are to be enumerated, the number of components is to be stated.
The area measured is the area serviced by the installation/system. The area serviced is measured using the rules of measurement for ascertaining the GIFA.
Where more than one installation/system is employed, the area measured for each system is the area serviced by the installation/system.
Where components are to be itemised, the number of key subcomponents comprising the component are to be identified, described and enumerated within the description of the component.
Other cost-significant items are to be measured by area (m2) or linear measurement (m), or enumerated (nr) and identified separately.
Work arising out of party wall awards/agreements is to be described and identified separately.
Where the contractor is only responsible for designing specific elements and/or components of the building project (i.e. not the entire building project), contractor-designed work is to be described and identified separately
The percentage additions for testing and commissioning are to be applied to the total cost of the items comprising the sub-element. A single combined percentage addition can be applied to cover the costs of both testing and commissioning
Included Items (9)
1 Repairs to existing sanitary appliances (including clearing blockages).
Repairs to/overhauling of existing mechanical and electrical plant and equipment (e.g. boilers, water heaters, storage tanks and vessels, and extractor fans), including the replacement of components.
Fault finding.
Overhauling existing mechanical and electrical installations and systems (e.g. heating installation,ventilation systems, electrical systems, etc.), including the replacement of components.
Repairs and upgrades to existing specialist services (e.g. lifts).
Renewing flue pipes.
Sundry items.
Testing and commissioning.
Where works are to be carried out by a subcontractor, the subcontractor’s preliminaries, design fees, risk allowance, overheads and profit, with allowance for these to be made within unit rate applied to element or component.
Excluded Items (3)
Decontaminating existing service systems prior to demolition, e.g. boilers and fuel storage tanks and vessels (included in sub-element 0.1.1).
New service installations (included in group element 5,as appropriate).
New service equipment and plant (included in group element 5, as appropriate).