6.1.1-1
Prefabricated modular buildings
Component Information
- Code:
- 6.1.1-1
- Sequence:
- 1
- Unit:
- m2
- Sub-Element:
- 6.1.1 - 1 Complete buildings
Prefabricated modular buildings
details to be stated.
Component Statistics
Measurement Rules
Included Items
Excluded Items
Measurement Rules (3)
The area measured is the GIFA of the complete building unit.
Where the contractor is only responsible for designing specific elements and/or components of the building project (i.e. not the entire building project), contractor-designed work is to be described and identified separately.
The percentage additions for testing and commissioning are to be applied to the total cost of the items comprising the sub-element. A single combined percentage addition can be applied to cover the costs of both testing and commissioning.
Included Items (6)
Complete self-finished prefabricated modular building systems for: • industrial use (e.g. a complete warehouses) • commercial use (e.g. a complete office building) • retail use (e.g. retail units and retail distribution centres) • agricultural use (e.g. complete livestock buildings and barns) • domestic use (complete dwellings, garages and workshops) • education use (complete school buildings)• healthcare buildings (e.g. complete offices, staff and public amenities, training centres, laboratories, day care centres and specialist surgical buildings)• other complete off-site prefabricated complete self-finished modular buildings (e.g. aircraft hangars).
Where included as part of the building systems: • structure, roof and wall cladding • rainwater drainage • windows, external doors, stairs, etc. • internal partitions, linings and finishes • internal doors • fixtures, furnishings and equipment • sanitary appliances • mechanical and electrical services • stopping up and sealing holes • fire-resistant stopping, including fire sleeves • fire breaks around units.
Final connections of cold water, hot water, electricity and other fuels to pods.
Sundry items.
Testing and commissioning
Where works are to be carried out by a subcontractor, the subcontractor’s preliminaries, design fees, risk allowance, overheads and profit, with allowance for these to be made within unit rate applied to element or component.
Excluded Items (6)
Prefabricated room units, supplied as completed units, manufactured off-site (included in sub-element 6.1.2).
Bathroom, toilet and shower pods, supplied as completed units, manufactured off-site (included in sub-element 6.1.3).
Non-permanent prefabricated buildings/building systems (i.e. used as temporary accommodation for the duration of the building project) (included in sub-elements 0.2.1 or 0.2.2,as appropriate)
Foundations and substructures (included in group element 1).
Drainage below ground (included in sub-element 1.1.3 or element 8.6, as appropriate).
Minor prefabricated buildings, such as workshops, sheds, stores, etc. (included in sub-element 8.8.2).