5.7.3-1

Smoke extraction/control systems

Unit: m2 Sub-Element: 5.7.3 - 3 Smoke extract/control
Component Information
Code:
5.7.3-1
Sequence:
1
Unit:
m2
Sub-Element:
5.7.3 - 3 Smoke extract/control
Description:

Smoke extraction/control systems

Details to State:

details to be stated.

Component Statistics
6
Measurement Rules
10
Included Items
4
Excluded Items
Measurement Rules (6)
C1 1

The area measured is the area serviced by the system (i.e. the area of the rooms and circulation spaces that are served by the system, which is not necessarily the total GIFA of the building). The area serviced is measured using the GIFA.

C2 2

Where more than one system is employed, the area measured for each system is the area serviced by the system.

C3 3

Installations for residential units, hotel rooms, student accommodation units, etc. may be enumerated (nr). The type of residential unit or room, and size (by number of bedrooms) of unit, is to be stated.

C4 4

Work to existing buildings is to be described and identified separately.

C5 5

Where the contractor is only responsible for designing specific elements and/or components of the building project (i.e. not the entire building project), contractor-designed work is to be described and identified separately.

C6 6

The percentage additions for testing and commissioning are to be applied to the total cost of the items comprising the sub-element. A single combined percentage addition can be applied to cover the costs of both testing and commissioning.

Included Items (10)
1.

Automatic smoke extraction systems, including natural smoke relief and fire ventilators, and powered smoke relief ventilators.

2.

Automatic smoke compartmentalisation systems.

3.

Fan units.

4.

Distribution ductwork and ductwork fittings and ancillaries, e.g. supports, hangers, access openings and dampers (control, fire and smoke).

5.

Grilles, fans, filters and other ancillary components of smoke ventilation systems.

6.

Vibration isolation mountings.

7.

Instrumentation and control components for smoke ventilation systems.

8.

Sundry items.

9.

Testing and commissioning.

10.

Where works are to be carried out by a subcontractor, the subcontractor’s preliminaries, design fees, risk allowance, overheads and profit, with allowance for these to be made within unit rate applied to element or component.

Excluded Items (4)
1. Ref: 2.3.5

Roof vents and roof cowls (included in sub-element 2.3.5).

2. Ref: 5.8.2

General-purpose LVLV power supplies (included in sub-element 5.8.2).

3. Ref: 5.12.3

Building management systems and other control systems (included in sub-element 5.12.3).

4. Ref: 5.14

Builder’s work in connection with services (included in element 5.14).