Central cooling systems

Unit: m2 Sub-Element: 5.6.3 - 3 Central cooling
Component Information
Code:
5.6.3-1
Sequence:
1
Unit:
m2
Sub-Element:
5.6.3 - 3 Central cooling
Description:

Central cooling systems

Details to State:

details to be stated

Component Statistics
5
Measurement Rules
20
Included Items
4
Excluded Items
Measurement Rules (5)
C1 1

The area measured is the area serviced by the system (i.e. the area of the rooms and circulation spaces that are served by the system, which is not necessarily the total GIFA of the building). The area serviced is measured using the rules of measurement for ascertaining the GIFA.

C2 2

Where more than one system is employed, the area measured for each system is the area serviced by the system.

C3 3

Work to existing buildings is to be described and identified separately.

C4 4

Where the contractor is only responsible for designing specific elements and/or components of the building project (i.e. not the entire building project), contractor-designed work is to be described and identified separately.

C5 5

The percentage additions for testing and commissioning are to be applied to the total cost of the items comprising the sub-element. A single combined percentage addition can be applied to cover the costs of both testing and commissioning.

Included Items (20)
1.

Chilled beams.

2.

Fan coil systems for cooling only.

3.

Air-based systems – variable air volume (VAV) for cooling only.

4.

Variable refrigerant volume (VRV) systems.

5.

Chillers and packaged chillers.

6.

Central refrigeration plant.

7.

Cooling towers.

8.

Distribution pipelines and pipeline fittings (including refrigerant distribution systems and chilled water distribution systems).

9.

Cold and treated water feeds (including central filtration plant).

10.

Valves.

11.

Pumps (including air-to-water heat pumps, water-to-water heat pumps, and brine-to-water pumps).

12.

Distribution ductwork and ductwork fittings and ancillaries, e.g. supports, hangers, access openings and dampers (control, fire and smoke).

13.

Grilles, fans, filters and other ancillary components of central cooling systems.

14.

Air handling units (AHUs).

15.

Emission units, including fan coil units, chilled beam, etc.

16.

Instrumentation and control components for central cooling systems (including relative and absolute humidity systems).

17.

Thermal insulation.

18.

Sundry items.

19.

Testing and commissioning.

20.

Where works are to be carried out by a subcontractor, the subcontractor’s preliminaries, design fees, risk allowance, overheads and profit, with allowance for these to be made within unit rate applied to element or component.

Excluded Items (4)
1. Ref: 5.8.2

General-purpose LVLV power supplies (included in sub-element 5.8.2).

2. Ref: 5.12.3

Building management systems and other control systems (included in sub-element 5.12.3).

3. Ref: 8.8.2

External cooling towers (included in sub-element 8.8.2).

4. Ref: 5.14

Builder’s work in connection with services (included in element 5.14).