5.14.1-1
Builder’s work in general areas
Component Information
- Code:
- 5.14.1-1
- Sequence:
- 1
- Unit:
- nr/m/m2/%
- Sub-Element:
- 5.14.1 - 1 Builder’s work in connection with services
Builder’s work in general areas
details to be stated.
Component Statistics
Measurement Rules
Included Items
Excluded Items
Measurement Rules (9)
Where quantifiable, cost-significant builder’s work items in connection with services should be separately identified and measured by area (m2) or linear measurement (m), or enumerated (nr).
Where components are to be enumerated, the number of components is to be stated.
Where the length of a component is to be measured, the length of linear components measured is their extreme length, over all obstructions.
When not quantifiable, or of a non-cost-significant nature, builder’s work items in connection with services should be identified and quantified by a percentage allowance or by applying the GIFA.
The area measured is the floor area relating to each builder’s work classification.
Percentage additions for builder’s work items in connection with services should be applied to the total cost of all elements comprising group element 5.
Other cost-significant items are to be measured by area (m2) or linear measurement (m), or enumerated (nr) and identified separately.
Work to existing buildings is to be described and identified separately.
Where the contractor is only responsible for designing specific elements and/or components of the building project (i.e. not the entire building project), contractor-designed work is to be described and identified separately.
Included Items (17)
Builder’s work in general areas.
Builder’s work to landlord’s areas.
Builder’s work to plant rooms.
Plant and equipment bases constructed on top of ground slabs and beds.
Fuel bunds, etc. for storage/retention tanks and vessels.
Forming/cutting holes, mortices, sinkings, chases, etc. including making good.
Ducts, pipe sleeves, etc.
Trench covers, duct covers and frames.
Supports for storage tanks, vessels, cisterns, etc.
Stopping up and sealing holes.
Fire-resistant stopping, including fire sleeves.
Fire breaks.
Painting/anti-corrosion treatment of mechanical service equipment, including fuel storage tanks and vessels, supports and pipelines.
Identification labelling and colour coding of service installations and systems.
Other builder’s work items in connection with services.
Sundry items.
Where works are to be carried out by a subcontractor, the subcontractor’s preliminaries, design fees, risk allowance, overheads and profit, with allowance for these to be made within unit rate applied to element or component.