4.1.3-1
Fittings
Component Information
- Code:
- 4.1.3-1
- Sequence:
- 1
- Unit:
- nr
- Sub-Element:
- 4.1.3 - 3 Special purpose fittings, furnishings and equipment
Fittings
details to be stated
Component Statistics
Measurement Rules
Included Items
Excluded Items
Measurement Rules (4)
Where components are to be enumerated, the number of components is to be stated.
Descriptions should include the amount of any PC sum included in the unit rates applied to the item.
Work to existing buildings is to be described and identified separately.
Where the contractor is only responsible for designing specific elements and/or components of the building project (i.e. not the entire building project), contractor-designed work is to be described and identified separately.
Included Items (5)
Furnishings, fittings and equipment designed specifically for a particular type of building, such as: • hospital, dentist, other medical, welfare and animal welfare buildings • entertainment buildings, community centres and clubs, including bars • sports buildings, swimming pools, marinas and stadia • religious and funerary buildings, including seating • educational buildings, including workbenches, blackboards and gymnasium equipment • scientific research buildings, including laboratory workbenches • special residential buildings, hotels and elderly care homes • rail, road, water and air transport buildings and terminals • agricultural, fishing and forestry buildings • communications, power supply, mineral supply and water supply buildings • laundry buildings • factories, and industrial buildings for food, drink, chemicals, engineering, textiles, etc. • shops, showrooms, stores, shopping centres and warehouses • defence, police, prison and fire service buildings • restaurants, snack bars and public houses • libraries, record offices, museums, galleries and zoos.
Other special-purpose fittings, furnishings and equipment.
Delivery, unpacking, sorting,checking all components, assembling and fixing in position (including all bolts and other fixing devices).
Sundry items.
Where works are to be carried out by a subcontractor, the subcontractor’s preliminaries, design fees, risk allowance, overheads and profit, with allowance for these to be made within unit rate applied to element or component.