3.2.1-1

Finishes to floors

Unit: m2 Sub-Element: 3.2.1 - 1 Finishes to floors
Component Information
Code:
3.2.1-1
Sequence:
1
Unit:
m2
Sub-Element:
3.2.1 - 1 Finishes to floors
Description:

Finishes to floors

Details to State:

details to be stated

Component Statistics
9
Measurement Rules
21
Included Items
5
Excluded Items
Measurement Rules (9)
C1 1

Where components are to be enumerated, the number of components is to be stated.

C2 2

The length of linear components measured is their extreme length, over all obstructions.

C3 3

The area measured for each type of floor finish is the surface area of the floor to which the finish is to be applied.

C4 4

The area measured for finishings to swimming pool tanks is the area of the swimming pool on plan, measured to the internal face of the swimming pool walls.

C5 5

Other cost-significant components are to be described and measured by area (m2) or linear measurement (m), or enumerated (nr) separately, as appropriate.

C6 6

Descriptions should include the amount of any PC sum included in the unit rates applied to the item.

C7 7

Curved work is to be described and identified separately.

C8 8

Work to existing buildings is to be described and identified separately.

C9 9

Where the contractor is only responsible for designing specific elements and/or components of the building project (i.e. not the entire building project), contractor-designed work is to be described and identified separately.

Included Items (21)
1.

Non-structural screeds, including under-screed damp-proof membranes.

2.

Latex screeds (i.e. levelling screeds).

3.

Chemical surface hardeners and sealers applied to screeds.

4.

Floating floors.

5.

Resin-bonded resilient layers.

6.

In situ floor finishes (e.g. granolithic and terrazzo).

7.

Tiled floor finishes (e.g. stone, quarry, ceramic and mosaic tiles).

8.

Wood block flooring, composition block flooring, parquet flooring, etc.

9.

Proprietary thin tiled and strip flooring, block wood flooring, etc.

10.

Floor painting and sealing.

11.

Edge-fixed carpeting, including underlay, rods, grippers, edgings, and cover and threshold strips.

12.

Fixed flexible and semi-flexible tile and sheet coverings (e.g. carpet, vinyl, rubber, PVC, thermoplastic, cork, linoleum and antistatic flooring).

13.

Timber sprung floors for sports halls, squash courts, etc

14.

Specialist floor covering systems.

15.

Finishes to swimming pool tanks, including tank linings.

16.

Floor finishes for internal and external balconies.

17.

Skirtings.

18.

Mat wells and mats.

19.

Line markings, numerals, letters, symbols, etc. (e.g. surface markings to denote car park spaces in basement car park).

20.

Sundry items.

21.

Where works are to be carried out by a subcontractor, the subcontractor’s preliminaries, design fees, risk allowance, overheads and profit, with allowance for these to be made within unit rate applied to element or component.

Excluded Items (5)
1. Ref: 2.1.1

Fire protective coatings and paint systems for structural steel frames (included in sub-element 2.1.1).

2. Ref: 1.1.3 ,2.2

Structural screeds (included in sub-element 1.1.3 or element 2.2, as appropriate).

3. Ref: 1.1.4

Finishes to stair treads and risers (included in sub-element 2.4.2).

4. Ref: 1.1.3 , 2.2

Finishes to floor surfaces integral to the floor construction, e.g. timber board flooring and timber strip/board fine flooring (included in sub-element 1.1.3 or element 2.2, as appropriate).

5. Ref: 3.2.2

Floor coverings and skirtings that form an integral part of a proprietary raised access floor system (included in sub-element 3.2.2).