2.8.1-1

Internal doors

Unit: nr Sub-Element: 2.8.1 - 1 Internal doors
Component Information
Code:
2.8.1-1
Sequence:
1
Unit:
nr
Sub-Element:
2.8.1 - 1 Internal doors
Description:

Internal doors

Details to State:

details, including type, number of door leaves (nr), size of each door leaf (mm), and overall size of opening (mm), to be stated

Component Statistics
7
Measurement Rules
12
Included Items
2
Excluded Items
Measurement Rules (7)
C1 1

Where components are to be enumerated, the number of components is to be stated.

C2 2

Where more than one type of component is employed, each component is measured.

C3 3

Cost-significant subcomponents are to be described and measured linearly (m) or enumerated (nr) separately, as appropriate.

C4 4

The length of linear components is their extreme length.

C5 5

Other cost-significant components are to be described and identified separately. Such components are to be measured by area (m2) or linear measurement (m), or enumerated (nr) separately.

C6 6

Work to existing buildings is to be described and identified separately.

C7 7

not the entire building project), contractor-designed work is to be described and identified separately.

Note: Where the contractor is only responsible for designing specific elements and/or components of the building project
Included Items (12)
1.

Doors, including standard doors, purpose-made doors, full-height doors and fire-resistant doors.

2.

Frames, linings, architraves, stops, etc.

3.

Door sets.

4.

Fanlights, over panels and sidelights, etc. integral to the door set.

5.

Glazed vision panels, etc.

6.

Sliding and folding doors in fixed partitions.

7.

Hatches, including doors, frames, linings, architraves, stops, etc.

8.

Internal roller shutters, sliding shutters, grilles, etc. including frames, linings, architraves, stops, etc.

9.

Ironmongery.

10.

Painting and decorating for internal doors.

11.

Sundry items.

12.

Where works are to be carried out by a subcontractor, the subcontractor’s preliminaries, design fees, risk allowance, overheads and profit, with allowance for these to be made within unit rate applied to element or component.

Excluded Items (2)
1. Ref: 2.7.1

Forming openings for doors in internal walls and partitions (included in sub-element 2.7.1: Openings in internal walls/partitions).

2. Ref: 2.7.3

Sliding and folding partitions (included in sub-element 2.7.3: Sliding/folding partitions).