2.5.5-1
Walls
Component Information
- Code:
- 2.5.5-1
- Sequence:
- 1
- Unit:
- m
- Sub-Element:
- 2.5.5 - 5 Subsidiary walls, balustrades and proprietary balconies
Walls
details to be stated
Component Statistics
Measurement Rules
Included Items
Excluded Items
Measurement Rules (8)
Where components are to be enumerated, the number of components is to be stated.
The length of linear components measured is their extreme length, over all obstructions.
Where more than one type of component is employed, each component is measured.
Other cost-significant components to be described and identified separately. Such components are to be measured by area (m2) or linear measurement (m), or enumerated (nr) separately.
Curved work is to be described and identified separately.
Work to existing buildings is to be described and identified separately.
The percentage additions for testing and commissioning are to be applied to the total cost of the items comprising the rainwater drainage installation. A single combined percentage addition can be applied to cover the costs of both testing and commissioning.
Contractor-designed work is to be described and identified separately.
Note: Where the contractor is only responsible for designing specific elements and/or components of the building project (i.e. not the entire building project).Included Items (11)
Low-level or dwarf walls, balustrades, handrails and railings for external walkways and balconies built off the upper floor construction, which form an integral part of the building envelope (e.g. to provide walkway between external enclosing wall and edge of upper floor construction), including walls forming planters.
Walls forming planters, including protection layer, drainage layer, filter membranes and growing medium.
Wall handrails.
Combined balustrades and handrails.
Railings and barriers for tops of parapet walls.
Proprietary bolt-on balconies (e.g. ‘Juliet’ balconies).
Surface water drainage from external walkways, etc. attached to building to first underground drain connection or gully, including floor outlets.
All work, materials, components, etc. required to construct subsidiary components.
Testing and commissioning of aboveground surface water drainage systems.
Sundry items.
Where works are to be carried out by a subcontractor, the subcontractor’s preliminaries, design fees, risk allowance, overheads and profit, with allowance for these to be made within unit rate applied to element or component.
Excluded Items (2)
Surface water drainage beyond the first underground drain connection or gully (included in sub-element 8.6.1: Surface water drainage).
Internal and external balconies that are an integral part of the upper floor construction (included in element 2.2, as appropriate: Upper floor construction).