0.6.3-1

Physical site investigation works

Unit: item Sub-Element: 0.6.3 - Other extraordinary site investigation works
Component Information
Code:
0.6.3-1
Sequence:
1
Unit:
item
Sub-Element:
0.6.3 - Other extraordinary site investigation works
Description:

Physical site investigation works

Details to State:

details to be stated

Component Statistics
4
Measurement Rules
3
Included Items
2
Excluded Items
Measurement Rules (4)
C1 1

Where components are to be enumerated, the number of components is to be stated.

C2 2

The linear length of components is measured on the centre line of the component.

C3 3

Where components are to be measured per week, the number of weeks is to be stated. The cost per week is to be calculated by multiplying the number of operatives by the number of days per week that they are in attendance.

C4 4

Where insufficient information is available, such works are to be included in group element 13, as appropriate.

Included Items (3)
1.

Physical works in connection with extraordinary site investigation works carried out by the main contractor.

2.

Provision of temporary screens,fences, barriers, etc. to cordon off working area.

3.

Attendance on specialists.

Excluded Items (2)
1. Ref: 11

Desktop studies (included in group element 11).

2. Ref: 11, 12

Specialist consultants’ fees and charges in connection with ascertaining and carrying out extraordinary site investigation works (included in group element 11 or group element 12).