0.6.2-1
Physical reptile/wildlife harm mitigation measures
Component Information
- Code:
- 0.6.2-1
- Sequence:
- 1
- Unit:
- item
- Sub-Element:
- 0.6.2 - 2 Reptile/wildlife mitigation measures
Physical reptile/wildlife harm mitigation measures
details to be stated
Component Statistics
Measurement Rules
Included Items
Excluded Items
Measurement Rules (4)
Where components are to be enumerated, the number of components is to be stated.
The linear length of components is measured on the centre line of the component.
Where components are to be measured per week, the number of weeks is to be stated. The cost per week is to be calculated by multiplying the number of operatives by the number of days per week that they are in attendance.
Where insufficient information is available, such works are to be included in group element 13, as appropriate.
Included Items (3)
Trapping and relocation of reptiles/wildlife, etc. carried out by the main contractor.
Provision of temporary fences, barriers, etc. to cordon off working area.
Attendance on specialists.
Excluded Items (2)
1 Desktop studies (included in group element 11).
Ecologist’s fees and charges in connection with ascertaining and carrying out reptile/wildlife harm mitigation measures (included in group elements 11 or 12, as appropriate).