Unit: m2 Sub-Element: 0.4.2 - 2 Soil stabilisation measures
Component Information
Code:
0.4.2-1
Sequence:
1
Unit:
m2
Sub-Element:
0.4.2 - 2 Soil stabilisation measures
Description:

Soil stabilisation measures

Details to State:

details to be stated

Component Statistics
2
Measurement Rules
3
Included Items
1
Excluded Items
Measurement Rules (2)
C1 1

The area measured is the area affected by the soil stabilisation measure.

C2 2

Other cost-significant components are to be described and identified separately.Such components are to be measured by area (m2) or linear measurement (m), or enumerated (nr) separately.

Included Items (3)
1.

Soil stabilisation measures, including:• cement or chemical grouting • electrochemical stabilisation • sand stowing • forming regular pattern of holes, compacting surrounding soil, and filling with aggregates or hard fill, all by means of power vibrators • soil nailing • use of ground anchors • pressure grouting • compacting • freezing of groundwater and subsoil • stabilising soil in situ by incorporating cement with a rotovator.

2.

Sundry items.

3.

Where works are to be carried out by a subcontractor, the subcontractor’s preliminaries, design fees, risk allowance, overheads and profit, with allowance for these to be made within unit rate applied to element or component.

Excluded Items (1)
1. Ref: 1.1.1, 1.1.3, 1.1.4 , 1.1.5

Consolidating and compacting formation level to receive construction (included in sub-elements 1.1.1, 1.1.3, 1.1.4 or 1.1.5, as appropriate).