0.3.1-1

Support structures

Unit: nr Sub-Element: 0.3.1 - 1 Temporary support to adjacent structures
Component Information
Code:
0.3.1-1
Sequence:
1
Unit:
nr
Sub-Element:
0.3.1 - 1 Temporary support to adjacent structures
Description:

Support structures

Details to State:

details to be stated

Component Statistics
2
Measurement Rules
10
Included Items
4
Excluded Items
Measurement Rules (2)
C1 1

Where components are to be enumerated, the number of components is to be stated.

C2 2

Work arising out of party wall awards/agreements is to be described and identified separately.

Included Items (10)
1.

Temporary or semi-permanent supports for structures adjacent to the site on which the building is being built, including party walls

2.

Location surveys.

3.

Commencement and completion condition surveys.

4.

Dead, raking, flying or box shoring; strutting (including bracing; sole plates and wall plates; needles, including holes;brackets, blockings and wedges; dog irons and similar metalwork).

5.

Foundations for shoring.

6.

Cutting holes in existing structures for needles, etc.

7.

Design, erection, maintenance, repositioning and removal of support structures.

8.

Periodic temporary inspections.

9.

Sundry items.

10.

Where works are to be carried out by a subcontractor, the subcontractor’s preliminaries, design fees, risk allowance, overheads and profit, with allowance for these to be made within unit rate applied to element or component.

Excluded Items (4)
1. Ref: 7.4

1 Facade retention works where existing facade is to be integrated into new building (included in element 7.4).

2. Ref: 0.2.1

Temporary supports for basement retaining walls (included in sub-element 0.2.1).

3. Ref: 7.1.1

Temporary screens required for alteration works (included in sub-element 7.1.1).

4. Ref: 7.1.1

Supports for small openings cut into existing walls or after removal of internal walls, etc. (included in sub-element 7.1.1)

Export