0.1.3-1
Eradication by dig and dump strategy
Component Information
- Code:
- 0.1.3-1
- Sequence:
- 1
- Unit:
- m2/m3
- Sub-Element:
- 0.1.3 - 3 Eradication of plant growth
Eradication by dig and dump strategy
details to be stated
Component Statistics
Measurement Rules
Included Items
Excluded Items
Measurement Rules (5)
Where components are to be enumerated, the number of components is to be stated.
The area measured is the area designated as infected by the plant growth.
Where the volume of excavation and disposal of contaminated ground material is measured, the volume measured is the surface area of the contaminated material multiplied by the average depth of the contaminated material.
Quantities given for disposal of contaminated ground material are the bulk before excavating and no allowance is made for subsequent variations to bulk or for extra space to accommodate earthwork support.
Other cost-significant components are to be described and identified separately.Such components are to be measured by area (m2) or linear measurement (m), or enumerated (nr) separately
Included Items (3)
Eradication by dig and dump strategy (including inserting a root barrier membrane system, etc.), including excavation and safe disposal of excavated material to licensed tip, tipping charges, landfill tax and backfilling voids with inert material.
Eradication by chemical treatment.
Where works are to be carried out by a subcontractor, the subcontractor’s preliminaries, design fees, risk allowance, overheads and profit, with allowance for these to be made within unit rate applie to element or component.
Excluded Items (2)
Site investigation surveys for Japanese knotweed, giant hogweed or other invasive plant species (included in element 11.1).
Supervision of removal of Japanese knotweed, giant hogweed or other invasive plant species by specialist consultant (included in element 11.1).