Components
660 TotalSearch & Filter Components
0.1.1-1 item
Toxic or hazardous material removal
0.1.1-2 item
Toxic or hazardous chemical removal
0.1.2-1 m2/m3
Contaminated ground material removal
0.1.2-2 m2
Contaminated ground material treatment
0.1.3-1 m2/m3
Eradication by dig and dump strategy
0.1.3-2 nr/m2
Eradication by chemical treatment
0.2.1-1 m2
Demolition of entire buildings
0.2.1-2 m2
Demolition of major parts of existing buildings
0.2.1-3 nr
Temporary propping to existing basement retaining walls
0.2.1-4 m
Extra over temporary propping for providing wailings
0.2.1-5 nr
Periodic technical inspections of temporary propping
0.2.1-6 nr
Returning to site to reposition temporary props
0.2.1-7 nr
Removal of temporary props
0.2.1-8 m
Removal of wailings
0.2.1-9 nr
Grubbing up of anchor blocks/foundations for temporary props and infilling voids
0.2.2-1 item/m2
Preparatory to demolition
0.2.2-2 item/m2
Preparatory to refurbishment
0.3.1-1 nr
Support structures
0.3.1-2 nr
Taking down and repositioning support structures
0.3.1-3 nr
Periodic technical inspections of temporary support structures
660
Total Components
656
Different Units
33
Pages
API Access
Access components data programmatically:
GET /api/components/- All componentsGET /api/sub-elements/{code}/components/- Components by sub-element